They have to have the following at a minimum:
· SharePoint/Project Server 2010 Admin experience
· Configuring and customizing Microsoft Project Server 2010 and SharePoint Server 2010
· Experience with planning, installing, configuring and deploying Project Server 2010Remember its not about using the tool as a user. Its about being able to manage the tool and be technically sound as an admin of the tool.
Candidate will ideally be certified in Project 2010 Enterprise. They must show an example "schedule" that they have created in Project Server 2010.
No telecommuting options available. Must be able to work in 1 of the above client locations. Enterprise Project Management (EPM) – large tool that does scheduling,
RESPONSIBILITIES:
· Review SharePoint and PWA Configuration via VPN
· Run through Test Scripts for PWA
· Uploading of existing plans to PWA
· Implementation of SharePoint and Project Server 2010 POC.
· Configuration of SharePoint and Project Server 2010 for the POC.
· Architecture Design, configuration of the MS Project Server application, testing and validation of Server
· Consult/create Enterprise Global fields containing calculations for Executive Dashboard
· Build custom template, views, reports based on clients direction (Plan templates with instructions and links)
· Recommendations for best practices (Configurations of PWA)
· Consult/create Enterprise Global fields containing calculations for Executive Dashboard
· Build custom template, views, reports based on clients direction (Plan templates with instructions and links)
· Technical Summary: SharePoint Server 2007-2010- Project Server 2007-2010, SQL Server 2005-2008, Project Professional 2007-2010, Visual Studio 2005-2008, Office 2007-2010, Windows Server 2003-2008
--
Regards,
Sindhu Hari
Resource Manager
W. 781-544-4799 * 114
F. 508.519.9180
sindhuh@boston-technology.com
www.boston-technology.com
33 Boston Post Road West, STE 110,
No comments:
Post a Comment